more than 120 installed steam boilers producing up to 1000 t/h of steam
more than 220 installed tanks and reservoirs up to 64,000 m³
more than 25,000 MW of nominal power for installed equipment
more than 120 installed steam turbines with a power up to 330 MW
more than 50 installed gas turbines with a power up to 300 MW
Nizhnevartovsk TPP
Installation of Gas turbine PG 9351FA 300 MW (Russia)
Urengoy TPP
Installation of 2 Gas turbines type GTE-160 (LMZ) of Combined Cycle Block 450 MW (Russia)
Alumina refinery plant Friguia S.A.
CHP plant of Alumina refinery plant «Fria» (Guinea).
Elswedi Electric PSP
«Mechanical installation jobs on the 10th block of 4800 MW power plant in Beni Suef» (Egypt)
Nuclear Power Station «Boucher»
construction and installation jobs (Iran)
TPP “ Deir Ali ”
Installation of Combined Cycle Block – 701MW (Syria)
ATHENA S.A.
CCP «Averinolakkos», the 2nd construction stage, (Crete, Greece)
LTD «Energomontazh-Polnots-Belkhatov»
jobs for prefabrication (manufacturing) of metal structures (Poland)
Novolipetsk Metallurgical Plant
Reconstruction of CHP: Mounting of 3 boilers type Е-220-9,8-540GD, 3 steam turbines type PT-40/50-8,8/1,3 (KTZ), auxiliary equipment, pipelines (Russia)
«Elektrėnų energetikos remontas»
UAB, Installation of 2 biomass boilers type OFZ-135 (Lithuania)
Elektrenayskaya TPP (Lithuania TPP)
Installation of gas turbine type 9FB (GE) and auxiliary equipment, in-turbine pipelines, generator (GE) and steam turbine 109D-12 (GE) (Lithuania)
Moskow CHP-16
Installation of Combined Cycle Block-420-Т with 1 steam turbine SST-5000 and 1 gas turbine SGT-4000F (Simens), (Russia)
Novomoskovskaya TPP
Installation of Combined Cycle Block-190 MW consisting of heat recovery steam generator, steam turbine Т-50/60-7,5/0,12 (KTZ), gas turbine PG9171E (GE), (Russia)
OJSC «Mosenergo» TPP-27
Installation of Combined Cycle block 450 MW with 2 gas turbines 160 MW each and steam turbine Т-125/150-7,2; Installation of 2 gas turbines GTE-160, in-turbine pipelines, auxiliary equipment, (Russia)
Moskow CHP -20
Moscow, Russia. Installation of Combined Cycle Block-420-Т consisting of: 1 steam turbine SST-5000, 1 gas turbine SGT-4000F (Siemens) , (Russia)
OJSC «Naftan» Construction of an isomerization unit with deisohexanization, (Belarus)